IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0246 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $5,728 $12,000 Not Implemented
TT0246 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,067 $33,750 Not Implemented
TT0246 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,939 $31,200 Implemented
TT0246 # 01 Y:2020 01 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,809,194 $245,104 Not Implemented
TT0246 # 02 Y:2020 02 2020 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $955,149 $750,000 Implemented
TT0246 # 03 Y:2020 03 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $492,629 $66,000 Implemented
TT0246 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $86,933 $48,800 Not Implemented
TT0246 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $65,738 $130,000 Not Implemented
OK1033 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,570 $27,786 Implemented
OK1033 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,433 $2,100 Implemented
OK1033 # 05 Y:2020 05 2020 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,056 $671 Not Implemented
OK1033 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $343 $0 Not Implemented
OK1033 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $262 $700 Implemented
WM0157 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,942 $3,194 Implemented
WM0157 # 06 Y:2020 06 2020 USE COMPRESSOR AIR FILTERS $4,984 $19,040 Not Implemented
WM0157 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $12,261 $51,086 Not Implemented
WM0157 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,160 $6,952 Not Implemented
WM0157 # 03 Y:2020 03 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $18,997 $0 Implemented
WM0157 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,506 $160,650 Not Implemented
WM0157 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $59,393 $500,000 Not Implemented
AM0801 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,690 $1,000 Implemented
AM0801 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,240 $1,265 Not Implemented
AM0801 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,735 $9,030 Implemented
AM0801 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,875 $2,660 Implemented
AM0801 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,150 $420 Not Implemented