Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsNAICS | 3315 | Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0185 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,263 | $354 | Not Implemented |
IP0185 # 03 Y:2023 | 03 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $738 | $180 | Not Implemented |
IP0185 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $692 | $273 | Not Implemented |
IP0185 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,389 | $2,562 | Not Implemented |
IP0185 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,963 | $14,490 | Not Implemented |
IP0185 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,450 | $0 | Not Implemented |
TT0296 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,078 | $4,500 | Not Implemented |
TT0296 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $41,037 | $32,500 | Not Implemented |
TT0296 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $81,000 | $60,000 | Implemented |
TT0296 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,264 | $1,920 | Implemented |
TT0296 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $22,207 | $1,640 | Implemented |
TT0296 # 03 Y:2023 | 03 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $200,000 | $10,000 | Not Implemented |
TT0296 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $66,640 | $2,000 | Not Implemented |
TT0296 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,069 | $270 | Not Implemented |
TT0296 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,690 | $8,100 | Implemented |
TT0296 # 10 Y:2023 | 10 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $203,680 | $300,000 | Not Implemented |
TT0296 # 11 Y:2023 | 11 | 2023 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $2,853 | $7,500 | Not Implemented |
CW0127 # 03 Y:2023 | 03 | 2023 | RECYCLE CASTING SAND | $414,227 | $38,394 | n/a |
CW0127 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,943 | $21,648 | n/a |
CW0127 # 05 Y:2023 | 05 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $10,872 | $33,000 | n/a |
CW0127 # 06 Y:2023 | 06 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $9,906 | $19,900 | n/a |
CW0127 # 02 Y:2023 | 02 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $16,199 | $33,933 | n/a |
CW0127 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,576 | $56,000 | n/a |
UF0595 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,368 | $289,896 | Not Implemented |
UF0595 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $39,683 | $20,785 | Implemented |