Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,080
matching recommendationsNAICS | 33151 | Ferrous Metal Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0596 # 03 Y:2025 | 03 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $26,110 | $14,500 | n/a |
LE0596 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,365 | $24,074 | n/a |
LE0596 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $702 | $660 | n/a |
LE0596 # 11 Y:2025 | 11 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $49,500 | $160,000 | n/a |
LE0596 # 10 Y:2025 | 10 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $90,409 | $240,000 | n/a |
LE0596 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,935 | $14,078 | n/a |
LE0596 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,423 | $5,658 | n/a |
LE0596 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,874 | $2,600 | n/a |
LE0596 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,210 | $8,000 | n/a |
LE0596 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,008 | $2,000 | n/a |
LE0596 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,044 | $45,000 | n/a |
LE0596 # 12 Y:2025 | 12 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,616 | $14,943 | n/a |
AS0603 # 04 Y:2025 | 04 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $18,772 | $291 | n/a |
AS0603 # 01 Y:2025 | 01 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $320,000 | $104,670 | n/a |
AS0603 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,172 | $545 | n/a |
AS0603 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,434 | $1,040,663 | n/a |
AS0603 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $478 | $246 | n/a |
AS0603 # 06 Y:2025 | 06 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,156 | $949 | n/a |
AS0603 # 02 Y:2025 | 02 | 2025 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $279,654 | $313,240 | n/a |
IP0205 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,273 | $56,876 | n/a |
IP0205 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,159 | $0 | n/a |
IP0205 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $1,388 | $3,150 | n/a |
IP0205 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,693 | $523 | n/a |
IP0205 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,763 | $0 | n/a |
IP0205 # 04 Y:2024 | 04 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $27,000 | $2,636 | n/a |