IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
Reset
NAICS 33151 Ferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0026 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $478 $15 Implemented
BS0026 # 03 Y:2013 03 2013 REUSE HIGH FERROUS METAL DUST AS RAW MATERIAL $1,699 $1,382 Not Implemented
BS0026 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,850 $752 Implemented
BS0026 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $120 Implemented
TT0119 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $2,477 Not Implemented
TT0119 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,340 $14,342 Not Implemented
TT0119 # 02 Y:2013 02 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,913 $1,500 Not Implemented
TT0119 # 13 Y:2013 13 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $193,873 $235,480 Not Implemented
TT0119 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,354 $1,340 Not Implemented
TT0119 # 14 Y:2013 14 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,650 $37,444 Not Implemented
TT0119 # 04 Y:2013 04 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,743 $6,500 Not Implemented
TT0119 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,000 $35,000 Not Implemented
TT0119 # 01 Y:2013 01 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $129,812 $50,000 Not Implemented
TT0119 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $688 Not Implemented
TT0119 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,882 $52,674 Not Implemented
TT0119 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,761 $22,540 Not Implemented
TT0119 # 03 Y:2013 03 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,907 $6,500 Not Implemented
TT0119 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,000 $25,000 Not Implemented
MZ0118 # 10 Y:2013 10 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $21 $60 Implemented
MZ0118 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $50 $0 Implemented
MZ0118 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $247 $100 Implemented
MZ0118 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,880 $950 Implemented
MZ0118 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,699 $0 Implemented
MZ0118 # 11 Y:2013 11 2013 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $702 $9,752 Implemented
MZ0118 # 05 Y:2013 05 2013 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $10,146 $59,000 Not Implemented