IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
NAICS 331512 Steel Investment Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0678 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $9,343 $0 Implemented
MA0678 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,186 $0 Implemented
MA0678 # 05 Y:2011 05 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,819 $26,495 Not Implemented
MA0678 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,833 $8,590 Not Implemented
UA0044 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,400 $0 Implemented
UA0044 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,187 $0 Implemented
UA0044 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,813 $50,000 Implemented
UA0044 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,108 $0 Not Implemented
UA0044 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,303 $11,000 Implemented
UA0044 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,858 $2,000 Implemented
UA0044 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $25,366 $0 Implemented
UA0044 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $166 $320 Not Implemented
UA0044 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,163 $0 Not Implemented
UA0044 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $91,712 $375,000 Not Implemented
UA0044 # 11 Y:2010 11 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $786 $494 Not Implemented
SU0280 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,297 $0 Implemented
SU0280 # 02 Y:2009 02 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,999 $0 Implemented
SU0280 # 03 Y:2009 03 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,445 $0 Implemented
SU0280 # 04 Y:2009 04 2009 USE SYNTHETIC LUBRICANT $1,438 $0 Not Implemented
SU0280 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,497 $378 Implemented
SU0280 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $4,873 $1,477 Implemented
SU0280 # 07 Y:2009 07 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,497 $3,768 Implemented
SU0280 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $405 Not Implemented
SU0280 # 09 Y:2009 09 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $47,225 $73,508 Not Implemented
SU0280 # 10 Y:2009 10 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $644 $1,009 Not Implemented