IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

241

matching recommendations
Reset
NAICS 331513 Steel Foundries (except Investment)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0078 # 05 Y:2016 05 2016 DEVELOP STANDARD OPERATING PROCEDURES $22,270 $4,336 Not Implemented
BS0078 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,130 $11,073 Not Implemented
BS0078 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $174 $187 Not Implemented
BS0078 # 02 Y:2016 02 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,270 $8,259 Not Implemented
BS0078 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $415 $162 Not Implemented
SF0476 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,871 $0 Implemented
SF0476 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,100 $280 Implemented
SF0476 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,817 $0 Implemented
SF0476 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,163 $913 Implemented
SF0476 # 05 Y:2015 05 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,486 $722 Not Implemented
SF0476 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,722 $386 Implemented
SF0476 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,324 $215 Implemented
SF0476 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,971 $4,378 Not Implemented
SF0476 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,239 $121,403 Implemented
SF0476 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,176 $17,481 Not Implemented
SF0476 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $7,038 $21,100 Implemented
BS0065 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,229 $46,340 Implemented
BS0065 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,088 $160 Implemented
BS0065 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,215 $10,715 Not Implemented
BS0065 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $148 $15 Implemented
AM0682 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,295 $7,280 Not Implemented
AM0682 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,840 $1,790 Implemented
AM0682 # 03 Y:2015 03 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,320 $5,400 Not Implemented
AM0682 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $1,000 Implemented
AM0682 # 01 Y:2015 01 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,985 $2,000 Not Implemented