Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 331513 | Steel Foundries (except Investment) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0596 # 12 Y:2025 | 12 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,616 | $14,943 | n/a |
LE0596 # 11 Y:2025 | 11 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $49,500 | $160,000 | n/a |
LE0596 # 10 Y:2025 | 10 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $90,409 | $240,000 | n/a |
LE0596 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,935 | $14,078 | n/a |
LE0596 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,365 | $24,074 | n/a |
LE0596 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,044 | $45,000 | n/a |
LE0596 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $702 | $660 | n/a |
LE0596 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,423 | $5,658 | n/a |
LE0596 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,008 | $2,000 | n/a |
LE0596 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,874 | $2,600 | n/a |
LE0596 # 03 Y:2025 | 03 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $26,110 | $14,500 | n/a |
LE0596 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,210 | $8,000 | n/a |
IP0205 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,763 | $0 | n/a |
IP0205 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $1,388 | $3,150 | n/a |
IP0205 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,273 | $56,876 | n/a |
IP0205 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,645 | $7,496 | n/a |
IP0205 # 06 Y:2024 | 06 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $46,331 | $50,406 | n/a |
IP0205 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,100 | $872 | n/a |
IP0205 # 04 Y:2024 | 04 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $27,000 | $2,636 | n/a |
IP0205 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,693 | $523 | n/a |
IP0205 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,159 | $0 | n/a |
SJ0018 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,691 | $4,253 | Not Implemented |
SJ0018 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,283 | $4,037 | Not Implemented |
SJ0018 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,985 | $11,774 | Not Implemented |
SJ0018 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,066 | $11,290 | Not Implemented |