IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
NAICS 33152 Nonferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0413 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,640 $2,160 Not Implemented
IA0413 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $2,135 Implemented
IA0413 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $350 $390 Not Implemented
IA0413 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $620 $535 Implemented
IA0413 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,793 $104 Implemented
IA0413 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,311 $360 Implemented
IA0413 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $9,370 $1,650 Not Implemented
IA0413 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,295 $20 Implemented
IA0413 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,287 $500 Implemented
IA0413 # 11 Y:2007 11 2007 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $677 $80 Implemented
IA0413 # 12 Y:2007 12 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $31,051 $4,000 Implemented
IA0404 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $5,712 $592 Not Implemented
IA0404 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,557 $38,557 Implemented
IA0404 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,817 $9,533 Implemented
IA0404 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,930 $30 Implemented
IA0404 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,428 $495 Implemented
IA0404 # 07 Y:2007 07 2007 REDUCE VENTILATION AIR $24,436 $4,500 Implemented
IA0404 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,029 $1,440 Implemented
IA0345 # 19 Y:2004 19 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $36,818 $85,000 Not Implemented
IA0345 # 18 Y:2004 18 2004 MOVE PRODUCT USING MECHANICAL MEANS $11,717 $11,122 Not Implemented
IA0345 # 17 Y:2004 17 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,145 $399 Implemented
IA0345 # 16 Y:2004 16 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,290 $1,100 Implemented
IA0345 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,085 $568 Implemented
IA0345 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,206 $2,062 Implemented
IA0345 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,195 $16,220 Implemented