IAC Assessment: IA0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2007
Principal Product Aluminum and Zinc Castings
NAICS 331523 - Nonferrous Metal Die-Casting Foundries
SIC 3363 - Aluminum Die-castings
Sales $5,000,000-$10,000,000
# of Employees 54
Plant Area (Sq.Ft.) 90,000
Annual Production 21,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,075 1,402,000 kWh $0.05
Electricity Demand $33,167 4,140 kW-months/year $8.01
Natural Gas $142,708 17,896 MMBtu $7.97
TOTAL ENERGY COSTS $240,950
RECOMMENDED SAVINGS* $55,361 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,229
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,287
Cost:
$500
$1,721 37,250 $566 72 - - - - $1,721
37,250
kWh
$566
72
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,295
Cost:
$20
$954 20,654 $341 43 - - - - $954
20,654
kWh
$341
43
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,370
Cost:
$1,650
- - - - $9,370 1,176 - - -
-
kWh
-
-
kW-months/year
$9,370
1,176
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,311
Cost:
$360
$953 20,707 $358 43 - - - - $953
20,707
kWh
$358
43
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,793
Cost:
$104
$1,232 26,719 $561 72 - - - - $1,232
26,719
kWh
$561
72
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$620
Cost:
$535
$466 10,059 $154 15 - - - - $466
10,059
kWh
$154
15
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$350
Cost:
$390
$350 1,056 - - - - - - $350
1,056
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,195
Cost:
$2,135
$873 18,865 $322 41 - - - - $873
18,865
kWh
$322
41
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,640
Cost:
$2,160
- - - - $1,640 107 - - -
-
kWh
-
-
kW-months/year
$1,640
107
MMBtu
-
-
$
10: 2.2514 COVER OPEN TANKS Savings:
$3,772
Cost:
$1,500
- - - - $3,772 296 - - -
-
kWh
-
-
kW-months/year
$3,772
296
MMBtu
-
-
$
11: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$677
Cost:
$80
$358 7,741 $319 40 - - - - $358
7,741
kWh
$319
40
kW-months/year
-
-
MMBtu
-
-
$
12: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$31,051
Cost:
$4,000
- - - - $820 103 $30,231 - -
-
kWh
-
-
kW-months/year
$820
103
MMBtu
$30,231
-
$
TOTAL RECOMMENDED Savings:
$55,361
Cost:
$13,434
$6,907 143,051 $2,621 326 $15,602 1,682 $30,231 - $6,907
143,051
kWh
$2,621
326
kW-months/year
$15,602
1,682
MMBtu
$30,231
-
$
TOTAL IMPLEMENTED Savings:
$40,229
Cost:
$7,734
$6,557 141,995 $2,621 326 $820 103 $30,231 - $6,557
141,995
kWh
$2,621
326
kW-months/year
$820
103
MMBtu
$30,231
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material