IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

998

matching recommendations
Reset
NAICS 33152 Nonferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0549 # 09 Y:2004 09 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,021 $1,100 Implemented
MA0549 # 10 Y:2004 10 2004 INSULATE BARE EQUIPMENT $463 $451 Not Implemented
MA0549 # 11 Y:2004 11 2004 DISCONNECT BALLASTS $197 $60 Implemented
IA0335 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,405 $25 Not Implemented
IA0335 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $474 Implemented
IA0335 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $886 $866 Implemented
IA0335 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,387 $6,232 Implemented
IA0335 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,647 $3,807 Implemented
IA0335 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $918 $1,729 Not Implemented
IA0335 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $11,767 $12,275 Implemented
IA0335 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $8,410 $6,902 Not Implemented
IA0335 # 09 Y:2004 09 2004 INSULATE BARE EQUIPMENT $1,097 $198 Not Implemented
LM0068 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,854 $5,078 Not Implemented
LM0068 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,564 $0 Not Implemented
LM0068 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $349 $267 Not Implemented
LM0068 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,866 $16,975 Not Implemented
LM0068 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,181 $260 Implemented
LM0068 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,079 $120 Not Implemented
LM0068 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,489 $368 Implemented
LM0068 # 08 Y:2004 08 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,318 $55,000 Not Implemented
LM0068 # 09 Y:2004 09 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,500 $0 Not Implemented
AM0450 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,200 $580 Implemented
AM0450 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,380 $0 Not Implemented
AM0450 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,975 $25 Not Implemented
AM0450 # 04 Y:2004 04 2004 INSTALL SKYLIGHTS $1,100 $830 Implemented