IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

998

matching recommendations
Reset
NAICS 33152 Nonferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0056 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,587 $690 Implemented
LM0056 # 02 Y:2003 02 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,713 $0 Implemented
LM0056 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,371 $1,200 Not Implemented
LM0056 # 04 Y:2003 04 2003 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $300,000 $5,000 Not Implemented
LM0056 # 05 Y:2003 05 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $450,000 $20,000 n/a
LM0056 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,754 $1,968 Not Implemented
LM0056 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,330 $6,675 Not Implemented
LM0056 # 08 Y:2003 08 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $35,000 $28,714 n/a
LM0056 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $3,504 $1,726 Not Implemented
LM0056 # 10 Y:2003 10 2003 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $356 $0 Not Implemented
WV0266 # 01 Y:2003 01 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $14,242 $10,500 Not Implemented
WV0266 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $22,125 $1,423 Implemented
WV0266 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,846 $250 Implemented
WV0266 # 04 Y:2003 04 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,430 $625 Implemented
WV0266 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,398 $735 Not Implemented
WV0266 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,057 $0 Not Implemented
WV0266 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,479 $6,285 Not Implemented
WV0266 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,937 $79 Implemented
WV0266 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,520 $150 Implemented
WV0266 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,326 $0 Implemented
WV0266 # 11 Y:2003 11 2003 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $142,002 $980,000 Not Implemented
WV0266 # 12 Y:2003 12 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,000 $2,550 Implemented
WV0266 # 13 Y:2003 13 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $994 $1,240 Not Implemented
WV0266 # 14 Y:2003 14 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $39,573 $0 Implemented
WV0266 # 15 Y:2003 15 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,178 $80 Not Implemented