IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 33152 Nonferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0271 # 10 Y:2022 10 2022 UPGRADE CONTROLS ON COMPRESSORS $237 $600 Implemented
TT0271 # 09 Y:2022 09 2022 INSTALL TIMERS AND/OR THERMOSTATS $435 $200 Implemented
TT0271 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $1,262 Not Implemented
TT0271 # 07 Y:2022 07 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,050 $640 Not Implemented
TT0271 # 06 Y:2022 06 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $1,316 $1,500 Implemented
TT0271 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $3,000 Implemented
TT0271 # 04 Y:2022 04 2022 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $2,610 $12,000 Not Implemented
TT0271 # 03 Y:2022 03 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,012 $0 Implemented
TT0271 # 02 Y:2022 02 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,358 $15,000 Not Implemented
TT0271 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,479 $1,500 Implemented
TT0191 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $3,453 $8,274 Implemented
TT0191 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,175 $250 Implemented
TT0191 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,861 $10,500 Not Implemented
TT0191 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,274 $3,000 Not Implemented
TT0191 # 01 Y:2017 01 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,156 $94,000 Implemented
TT0026 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,300 $63,800 Not Implemented
TT0026 # 08 Y:2008 08 2008 OPTIMIZE PLANT POWER FACTOR $1,150 $6,000 Not Implemented
TT0026 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $25,000 $1,000 Not Implemented
TT0026 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,000 $4,900 Not Implemented
TT0026 # 05 Y:2008 05 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,119 $55,000 Not Implemented
TT0026 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $590 Not Implemented
TT0026 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,430 $3,640 Not Implemented
TT0026 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,980 $6,600 Not Implemented