Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
268
matching recommendationsNAICS | 33152 | Nonferrous Metal Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0085 # 03 Y:2004 | 03 | 2004 | CLEAN FOULING FROM WATER LINES REGULARLY | $2,852 | $180 | Implemented |
LM0085 # 05 Y:2004 | 05 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,902 | $600 | Implemented |
LM0085 # 07 Y:2004 | 07 | 2004 | $9,060 | $1,500 | Implemented | |
LM0085 # 04 Y:2004 | 04 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,335 | $741 | Not Implemented |
LM0085 # 10 Y:2004 | 10 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $54,080 | $3,320 | Implemented |
LM0085 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,324 | $205 | Implemented |
LM0085 # 08 Y:2004 | 08 | 2004 | DEVELOP STANDARD OPERATING PROCEDURES | $18,000 | $2,450 | Implemented |
LM0085 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $167 | $0 | Implemented |
LM0085 # 06 Y:2004 | 06 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $26,300 | $4,450 | Implemented |
LM0085 # 09 Y:2004 | 09 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,360 | $1,850 | Implemented |
LE0200 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $9,386 | $360 | Not Implemented |
LE0200 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,132 | $400 | Implemented |
LE0200 # 03 Y:2004 | 03 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,305 | $800 | Implemented |
LE0200 # 11 Y:2004 | 11 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $657 | $380 | Implemented |
LE0200 # 09 Y:2004 | 09 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $857 | $200 | Implemented |
LE0200 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,198 | $0 | Implemented |
LE0200 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,878 | $4,000 | Implemented |
LE0200 # 10 Y:2004 | 10 | 2004 | USE OPTIMUM THICKNESS INSULATION | $768 | $300 | Implemented |
LE0200 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,210 | $3,000 | Implemented |
LE0200 # 08 Y:2004 | 08 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $904 | $500 | Implemented |
LE0200 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,266 | $750 | Implemented |
NC0296 # 04 Y:2004 | 04 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,604 | $7,125 | Not Implemented |
NC0296 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,562 | $2,000 | Implemented |
NC0296 # 01 Y:2004 | 01 | 2004 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $39,660 | $7,500 | Implemented |
NC0296 # 02 Y:2004 | 02 | 2004 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $22,518 | $10,000 | Not Implemented |