Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
393
matching recommendationsNAICS | 331524 | Aluminum Foundries (except Die-Casting) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0233 # 03 Y:2025 | 03 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,094 | $18,160 | n/a |
WM0233 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $373 | $3,136 | n/a |
WM0233 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,278 | $0 | n/a |
WM0233 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $329 | $810 | n/a |
WM0233 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $97,017 | $800,000 | n/a |
WM0233 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,262 | $1,500 | n/a |
IP0202 # 02 Y:2024 | 02 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,291 | $0 | n/a |
IP0202 # 06 Y:2024 | 06 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,924 | $1,309 | n/a |
IP0202 # 08 Y:2024 | 08 | 2024 | USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER | $99,783 | $28,120 | n/a |
IP0202 # 10 Y:2024 | 10 | 2024 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $752 | $700 | n/a |
IP0202 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,012 | $11,226 | n/a |
IP0202 # 07 Y:2024 | 07 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $21,856 | $5,952 | n/a |
IP0202 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,335 | $0 | n/a |
IP0202 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,233 | $827 | n/a |
IP0202 # 12 Y:2024 | 12 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $743 | $2,940 | n/a |
IP0202 # 11 Y:2024 | 11 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,920 | $1,969 | n/a |
IP0202 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,000 | $0 | n/a |
IP0202 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $695 | $21 | n/a |
IP0199 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $257 | $668 | n/a |
IP0199 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,242 | $85 | n/a |
IP0199 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,284 | $4,422 | n/a |
IP0199 # 09 Y:2024 | 09 | 2024 | REPLACE BOILER | $434,522 | $2,000,000 | n/a |
IP0199 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $706 | $1,069 | n/a |
IP0199 # 02 Y:2024 | 02 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $287 | $25 | n/a |
IP0199 # 05 Y:2024 | 05 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,328 | $3,600 | n/a |