Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 331529 | Other Nonferrous Metal Foundries (except Die-Casting) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0916 # 02 Y:2014 | 02 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,027 | $0 | Not Implemented |
UD0916 # 01 Y:2014 | 01 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,270 | $0 | Not Implemented |
UD0916 # 12 Y:2014 | 12 | 2014 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $12,800 | $0 | Implemented |
UD0916 # 11 Y:2014 | 11 | 2014 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $9,661 | $40,000 | Not Implemented |
UD0916 # 10 Y:2014 | 10 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $10,562 | $110,000 | Implemented |
UD0916 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,978 | $1,000 | Implemented |
UD0916 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $896 | $0 | Not Implemented |
UD0916 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,426 | $4,150 | Not Implemented |
UD0916 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $503 | $500 | Implemented |
UD0916 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,413 | $26,040 | Not Implemented |
UD0916 # 04 Y:2014 | 04 | 2014 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $25,351 | $43,280 | Not Implemented |
UD0916 # 03 Y:2014 | 03 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $6,076 | $11,700 | Not Implemented |
WV0320 # 16 Y:2005 | 16 | 2005 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $351 | $26 | Not Implemented |
WV0320 # 15 Y:2005 | 15 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $438 | $80 | Implemented |
WV0320 # 14 Y:2005 | 14 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $457 | $430 | Implemented |
WV0320 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $474 | $488 | Not Implemented |
WV0320 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $487 | $400 | Not Implemented |
WV0320 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $728 | $667 | Implemented |
WV0320 # 10 Y:2005 | 10 | 2005 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $975 | $955 | Not Implemented |
WV0320 # 09 Y:2005 | 09 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,621 | $213 | Implemented |
WV0320 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,732 | $1,645 | Implemented |
WV0320 # 07 Y:2005 | 07 | 2005 | USE COMPRESSOR AIR FILTERS | $2,183 | $800 | Not Implemented |
WV0320 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,232 | $0 | Not Implemented |
WV0320 # 05 Y:2005 | 05 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,094 | $2,700 | Implemented |
WV0320 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $4,359 | $4,750 | Implemented |