IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

498

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS023 # 01 Y:2012 01 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,820 $44,000 Implemented
MAS023 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,502 $7,500 Implemented
MAS023 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,970 $8,500 Implemented
MAS023 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,899 $9,580 Implemented
MAS023 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,978 $3,000 Not Implemented
MAS023 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,575 $3,130 Not Implemented
MAS023 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $596 $0 Implemented
MA0691 # 01 Y:2012 01 2012 REPLACE BOILER $9,946 $38,400 Not Implemented
MA0691 # 02 Y:2012 02 2012 USE MINIMUM SAFE OVEN VENTILATION $9,618 $18,525 Not Implemented
MA0691 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $9,192 $42,500 Not Implemented
MA0691 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,115 $19,125 Not Implemented
MA0691 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $772 $1,575 Implemented
MA0691 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $249 $200 Implemented
TT0089 # 01 Y:2012 01 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,022 $6,293 Not Implemented
TT0089 # 02 Y:2012 02 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,031 $89,180 Not Implemented
TT0089 # 03 Y:2012 03 2012 USE SOLAR HEAT FOR HEAT $25,369 $109,680 Not Implemented
TT0089 # 04 Y:2012 04 2012 INSTALL SKYLIGHTS $7,188 $96,000 Not Implemented
CO0656 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $630 Implemented
CO0656 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $53,300 Implemented
CO0656 # 03 Y:2012 03 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,620 $62,400 Not Implemented
CO0656 # 04 Y:2012 04 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,530 $4,000 Implemented
CO0656 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,280 $260 Implemented
CO0656 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $6,960 Not Implemented
MAS022 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $19,167 $20,900 Implemented
MAS022 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,821 $2,600 Implemented