IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0060 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $786 $3,000 Implemented
WM0060 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $680 $255 Implemented
UD0918 # 01 Y:2015 01 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,159 $700 Not Implemented
UD0918 # 02 Y:2015 02 2015 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,098 $0 Not Implemented
UD0918 # 03 Y:2015 03 2015 USE RADIANT HEATER FOR SPOT HEATING $4,208 $1,050 Not Implemented
UD0918 # 04 Y:2015 04 2015 DEVELOP A REPAIR/REPLACE POLICY $58,864 $75,499 Implemented
UD0918 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,325 $0 Implemented
UD0918 # 06 Y:2015 06 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,416 $23,545 Not Implemented
UD0918 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,952 $45,000 Not Implemented
UD0918 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,773 $4,785 Implemented
UD0918 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $537 $1,000 Implemented
UM0452 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,871 $1,000 Not Implemented
UM0452 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,393 $2,500 Implemented
UM0452 # 03 Y:2015 03 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $28,779 $28,000 Implemented
UM0452 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,903 $4,000 Implemented
LE0387 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $1,375 $0 Not Implemented
LE0387 # 02 Y:2015 02 2015 ADJUST VENTS TO MINIMIZE ENERGY USE $163,566 $7,716 Not Implemented
LE0387 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,549 $1,000 Not Implemented
LE0387 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $67,292 $22,580 Not Implemented
LE0387 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,707 $2,050 Not Implemented
LE0387 # 06 Y:2015 06 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $83,193 $86,300 Not Implemented
LE0387 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,929 $14,175 Not Implemented
LE0387 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,919 $23,100 Not Implemented
MA0738 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $59,139 $500 Implemented
MA0738 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,551 $1,000 Implemented