IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,507

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1106 # 04 Y:2024 04 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,650 $8,580 Not Implemented
OK1106 # 05 Y:2024 05 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,777 $4,495 Implemented
OK1106 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $602 Not Implemented
OK1106 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $149 $0 Not Implemented
DL0235 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $719 $0 n/a
DL0235 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $751 $800 n/a
DL0235 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,885 $500 n/a
DL0235 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,674 $10,000 n/a
DL0235 # 05 Y:2024 05 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $646 $3,000 n/a
DL0235 # 06 Y:2024 06 2024 REDUCE VENTILATION AIR $1,085 $0 n/a
DL0235 # 07 Y:2024 07 2024 ADJUST VENTS TO MINIMIZE ENERGY USE $814 $1,500 n/a
UL2317 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $16,039 $148,666 n/a
UL2317 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,159 $0 n/a
UL2317 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $2,077 n/a
UL2317 # 04 Y:2023 04 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $2,720 $500 n/a
UL2317 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $6,865 $9,100 n/a
IC0295 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,690 $3,413 Implemented
IC0295 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,497 $558 Implemented
IC0295 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,248 $0 Implemented
IC0295 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,828 $7,539 Not Implemented
IC0295 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,221 $6,343 Not Implemented
IC0295 # 06 Y:2024 06 2024 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $16,247 $16,893 Not Implemented
IC0295 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $843 $490 Implemented
WM0210 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $12,043 $21,250 Not Implemented
WM0210 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,116 $0 Not Implemented