IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

300

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2316 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,296 $25,200 Not Implemented
LS2316 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,726 $4,515 Implemented
LS2316 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $1,069 $370 Not Implemented
LS2316 # 01 Y:2023 01 2023 INSTALL TIMERS AND/OR THERMOSTATS $3,030 $30 Not Implemented
LS2316 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,894 $135 Implemented
LT8374 # 03 Y:2023 03 2023 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $30,878 $30,000 Implemented
LT8374 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,966 $9,823 Not Implemented
LT8374 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $24,154 $0 Implemented
LT8374 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $96 $350 Not Implemented
LT8365 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,577 $1,300 Not Implemented
LT8365 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,434 $216,000 Not Implemented
LT8365 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $55,888 $0 Implemented
LT8370 # 03 Y:2023 03 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $24,363 $0 Implemented
LT8370 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,034 $0 Implemented
LT8370 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,372 $1,800 Implemented
LT8370 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,864 $8,022 Not Implemented
LT8362 # 07 Y:2022 07 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $223 $180 Implemented
LT8362 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $808 $29,000 Implemented
LT8362 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,079 $0 Not Implemented
LT8362 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,938 $0 Not Implemented
LT8362 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,493 $30,000 Not Implemented
LT8362 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $673 $0 Implemented
LT8362 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $10,089 $0 Implemented
LS2217 # 05 Y:2022 05 2022 USE PHOTOCELL CONTROLS $797 $703 Not Implemented
LS2217 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,897 $1,010 Implemented