IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0464 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,737 $33,313 Implemented
IA0464 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,378 $7,606 Implemented
WV0431 # 01 Y:2011 01 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $135,254 $682,000 Implemented
WV0431 # 02 Y:2011 02 2011 USE OPTIMUM THICKNESS INSULATION $29,707 $75,000 Not Implemented
WV0431 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,355 $11,500 Not Implemented
WV0431 # 04 Y:2011 04 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,105 $1,850 Implemented
WV0431 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $6,207 $1,076 Implemented
WV0431 # 06 Y:2011 06 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,020 $0 Not Implemented
WV0431 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $2,808 $408 Implemented
WV0431 # 08 Y:2011 08 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,027 $1,560 Implemented
BD0394 # 01 Y:2011 01 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $58,796 $139,000 Not Implemented
BD0394 # 02 Y:2011 02 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $35,291 $9,000 Not Implemented
BD0394 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,544 $2,400 Implemented
BD0394 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,571 $2,360 Implemented
BD0394 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,201 $1,652 Implemented
BD0394 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,201 $400 Implemented
BD0394 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $855 $225 Implemented
NC0426 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,495 $2,825 Not Implemented
NC0426 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $1,530 Implemented
NC0426 # 03 Y:2011 03 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,690 $3,750 Not Implemented
NC0426 # 04 Y:2011 04 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,171 $4,700 Not Implemented
NC0426 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $302 $25 Implemented
NC0426 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98 $100 Implemented
NC0426 # 07 Y:2011 07 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,569 $21,550 Not Implemented
UM0391 # 01 Y:2011 01 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $38,198 $7,100 Not Implemented