Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,517
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0423 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,401 | $16,000 | n/a |
UM0301 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $9,958 | $30,000 | Not Implemented |
UM0301 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $6,754 | $1,971 | Implemented |
UM0301 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,429 | $9,875 | Not Implemented |
UM0301 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,344 | $500 | Not Implemented |
UM0301 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,457 | $375 | Implemented |
UM0301 # 06 Y:2006 | 06 | 2006 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,498 | $738 | Not Implemented |
UM0301 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,325 | $0 | Implemented |
UM0301 # 08 Y:2006 | 08 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,415 | $1,363 | Not Implemented |
UM0301 # 09 Y:2006 | 09 | 2006 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $328 | $328 | Not Implemented |
UM0301 # 10 Y:2006 | 10 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,062 | $300 | Not Implemented |
UM0301 # 11 Y:2006 | 11 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $218 | $500 | Not Implemented |
UM0300 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $537 | $1,000 | Implemented |
UM0300 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $75 | Implemented |
UM0300 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $15,780 | $14,167 | Implemented |
UM0300 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,203 | $2,500 | Implemented |
UM0300 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,520 | $515 | Implemented |
UM0300 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,993 | $500 | Implemented |
UM0300 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $972 | $560 | Implemented |
UM0300 # 06 Y:2006 | 06 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $696 | $825 | Implemented |
AS0422 # 01 Y:2006 | 01 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $562,419 | $119,490 | n/a |
AS0422 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,736 | $9,000 | n/a |
AS0422 # 03 Y:2006 | 03 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,763 | $33,120 | n/a |
AS0422 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231 | $13,918 | n/a |
AS0422 # 05 Y:2006 | 05 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,824 | $0 | n/a |