IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,517

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0499 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $2,270 $5,600 Not Implemented
AM0499 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,380 $1,080 Not Implemented
AM0499 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $735 $0 Implemented
AM0499 # 09 Y:2005 09 2005 USE OPTIMUM THICKNESS INSULATION $505 $35 Not Implemented
AM0499 # 10 Y:2005 10 2005 USE OPTIMUM THICKNESS INSULATION $270 $40 Not Implemented
UM0294 # 01 Y:2005 01 2005 COVER OPEN TANKS $48,559 $7,232 Not Implemented
UM0294 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,274 $600 Not Implemented
UM0294 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,684 $4,536 Not Implemented
UM0294 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,051 $2,400 Not Implemented
UM0294 # 05 Y:2005 05 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,604 $3,000 Not Implemented
UM0294 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,231 $1,344 Not Implemented
UM0292 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,731 $23,005 Not Implemented
UM0292 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,368 $5,000 Implemented
UM0292 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $480 Implemented
UM0292 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,943 $50 Implemented
UM0292 # 05 Y:2005 05 2005 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,193 $3,000 Not Implemented
UM0292 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $821 $368 Not Implemented
UU0096 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $330 Not Implemented
UU0096 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,320 $5,000 Not Implemented
UU0096 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $2,530 $2,040 Not Implemented
UU0096 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,320 $1,950 Not Implemented
UU0096 # 05 Y:2005 05 2005 RECOVER AND REUSE WASTE MATERIAL $9,000 $0 Not Implemented
IA0378 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $385 Implemented
IA0378 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,533 $1,936 Not Implemented
IA0378 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,476 $2,255 Not Implemented