Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,517
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0288 # 07 Y:2004 | 07 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,244 | $18,900 | Not Implemented |
WV0298 # 01 Y:2004 | 01 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,459 | $2,100 | Not Implemented |
WV0298 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,929 | $440 | Implemented |
WV0298 # 03 Y:2004 | 03 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $2,864 | $1,928 | Not Implemented |
WV0298 # 04 Y:2004 | 04 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,447 | $220 | Implemented |
WV0298 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $2,066 | $1,286 | Not Implemented |
WV0298 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,986 | $0 | Not Implemented |
WV0298 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,877 | $240 | Implemented |
WV0298 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,304 | $0 | Implemented |
WV0298 # 09 Y:2004 | 09 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $736 | $705 | Implemented |
WV0298 # 10 Y:2004 | 10 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $794 | $1,825 | Not Implemented |
WV0298 # 11 Y:2004 | 11 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $762 | $750 | Implemented |
WV0298 # 12 Y:2004 | 12 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $565 | $1,000 | Not Implemented |
WV0298 # 13 Y:2004 | 13 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $461 | $360 | Implemented |
GT0788 # 01 Y:2004 | 01 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $7,899 | $0 | Implemented |
GT0788 # 02 Y:2004 | 02 | 2004 | COMBINE UTILITY METERS | $16,373 | $0 | Not Implemented |
GT0788 # 03 Y:2004 | 03 | 2004 | COVER OPEN TANKS | $4,940 | $3,185 | Not Implemented |
GT0788 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,315 | $31,400 | Not Implemented |
GT0788 # 05 Y:2004 | 05 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,123 | $3,450 | Implemented |
GT0788 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,890 | $0 | Implemented |
GT0788 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $144 | $1,100 | Implemented |
GT0788 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,396 | $3,768 | Implemented |
GT0788 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $760 | $1,200 | Implemented |
GT0788 # 10 Y:2004 | 10 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,462 | $1,000 | Not Implemented |
SF0289 # 01 Y:2004 | 01 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,527 | $2,527 | Implemented |