IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,517

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0557 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $5,528 $3,118 Implemented
MA0557 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,428 $3,450 Implemented
MA0557 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $1,706 $708 Implemented
MA0557 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $1,340 Implemented
UF0346 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $12,968 $5,044 Not Implemented
UF0346 # 02 Y:2004 02 2004 INSTALL SKYLIGHTS $3,241 $8,578 Not Implemented
UF0346 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $908 $5,504 Implemented
UF0346 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $942 $210 Implemented
UF0346 # 05 Y:2004 05 2004 CONVERT TO ROBOTIC PAINTING $24,976 $124,000 Not Implemented
IC0083 # 01 Y:2004 01 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $31,787 $32,056 Not Implemented
IC0083 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,453 $2,048 Implemented
IC0083 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $239 $508 Not Implemented
IC0083 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,166 $18,190 Not Implemented
MI0084 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,732 $1,000 Not Implemented
MI0084 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $600,000 $183,400 Not Implemented
MI0084 # 03 Y:2004 03 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,289 $17,650 Not Implemented
MI0084 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $697 $590 Not Implemented
MI0084 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $198 $0 Not Implemented
SD0344 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,981 $35,875 Implemented
SD0344 # 02 Y:2004 02 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $6,983 $7,700 Not Implemented
SD0344 # 03 Y:2004 03 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,464 $27,829 Not Implemented
SD0344 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,104 $440 Implemented
SD0344 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,399 $18,500 Implemented
BD0265 # 01 Y:2004 01 2004 USE RADIANT HEATER FOR SPOT HEATING $27,949 $4,200 Not Implemented
BD0265 # 02 Y:2004 02 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,335 $20,000 Not Implemented