Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
11,109
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0070 # 08 Y:2025 | 08 | 2025 | USE PHOTOCELL CONTROLS | $150 | $296 | n/a |
MU0070 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $545 | $348 | n/a |
MU0070 # 10 Y:2025 | 10 | 2025 | REDUCE HEAT GAIN BY WINDOW TINTING | $550 | $6,426 | n/a |
MU0070 # 11 Y:2025 | 11 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $6 | $65 | n/a |
MU0070 # 12 Y:2025 | 12 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $185 | $352 | n/a |
MU0070 # 13 Y:2025 | 13 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $61 | $152 | n/a |
MU0070 # 14 Y:2025 | 14 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $178 | $0 | n/a |
MU0070 # 07 Y:2025 | 07 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $660 | $0 | n/a |
MU0070 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $881 | $0 | n/a |
MU0070 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $173 | $1,250 | n/a |
MU0070 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $75 | n/a |
MU0070 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $121 | $177 | n/a |
MU0070 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,332 | $6,432 | n/a |
MU0070 # 01 Y:2025 | 01 | 2025 | USE UTILITY CONTROLLED POWER MANAGEMENT | $5,350 | $0 | n/a |
WV0688 # 12 Y:2025 | 12 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $203 | $673 | n/a |
WV0688 # 11 Y:2025 | 11 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $245 | $70 | n/a |
WV0688 # 10 Y:2025 | 10 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $1,229 | $5,827 | n/a |
WV0688 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,242 | $743 | n/a |
WV0688 # 08 Y:2025 | 08 | 2025 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,612 | $1,500 | n/a |
WV0688 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,391 | $10,040 | n/a |
WV0688 # 06 Y:2025 | 06 | 2025 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,913 | $21,336 | n/a |
WV0688 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $5,215 | $5,557 | n/a |
WV0688 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,295 | $24,800 | n/a |
WV0688 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $9,267 | $13,716 | n/a |
WV0688 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,123 | $9,580 | n/a |