IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,507

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0158 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $4,617 $1,050 Not Implemented
LE0158 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,483 $400 Implemented
LE0158 # 06 Y:2003 06 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,360 $0 Implemented
LE0158 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $425 $675 Not Implemented
OK0666 # 01 Y:2003 01 2003 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $15,468 $30,000 Not Implemented
OK0666 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $18,000 $0 Not Implemented
OK0666 # 03 Y:2003 03 2003 INSTALL SET-BACK TIMERS $11,925 $1,200 Not Implemented
OK0666 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $543 $404 Not Implemented
OK0666 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,253 $3,276 Not Implemented
OK0666 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,844 $100 Not Implemented
OK0666 # 07 Y:2003 07 2003 USE A DIFFERENT OR RECYCLED RAW MATERIAL $136,157 $28,500 Not Implemented
OK0666 # 08 Y:2003 08 2003 IMPROVE SPACE COMFORT CONDITIONING $58,240 $20,000 Not Implemented
UM0234 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $71,900 $180,000 Implemented
UM0234 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,488 $360 Not Implemented
UM0234 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,415 $2,925 Not Implemented
UM0234 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,603 $120,000 Implemented
UM0234 # 05 Y:2003 05 2003 COVER OPEN TANKS $8,523 $2,000 Not Implemented
UM0234 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,198 $5,219 Not Implemented
UD0671 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $137,400 $100,000 Not Implemented
UD0671 # 02 Y:2003 02 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,075 $70 Implemented
UD0671 # 03 Y:2003 03 2003 ADD AREA LIGHTING SWITCHES $12,090 $15,000 Not Implemented
UD0671 # 04 Y:2003 04 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,713 $0 Not Implemented
UD0671 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,275 $0 Implemented
UD0671 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,103 $442 Not Implemented
UD0671 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $896 $270 Not Implemented