Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,507
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0158 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $4,617 | $1,050 | Not Implemented |
LE0158 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,483 | $400 | Implemented |
LE0158 # 06 Y:2003 | 06 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,360 | $0 | Implemented |
LE0158 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $425 | $675 | Not Implemented |
OK0666 # 01 Y:2003 | 01 | 2003 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $15,468 | $30,000 | Not Implemented |
OK0666 # 02 Y:2003 | 02 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $18,000 | $0 | Not Implemented |
OK0666 # 03 Y:2003 | 03 | 2003 | INSTALL SET-BACK TIMERS | $11,925 | $1,200 | Not Implemented |
OK0666 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $543 | $404 | Not Implemented |
OK0666 # 05 Y:2003 | 05 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,253 | $3,276 | Not Implemented |
OK0666 # 06 Y:2003 | 06 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,844 | $100 | Not Implemented |
OK0666 # 07 Y:2003 | 07 | 2003 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $136,157 | $28,500 | Not Implemented |
OK0666 # 08 Y:2003 | 08 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $58,240 | $20,000 | Not Implemented |
UM0234 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $71,900 | $180,000 | Implemented |
UM0234 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $27,488 | $360 | Not Implemented |
UM0234 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,415 | $2,925 | Not Implemented |
UM0234 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,603 | $120,000 | Implemented |
UM0234 # 05 Y:2003 | 05 | 2003 | COVER OPEN TANKS | $8,523 | $2,000 | Not Implemented |
UM0234 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,198 | $5,219 | Not Implemented |
UD0671 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $137,400 | $100,000 | Not Implemented |
UD0671 # 02 Y:2003 | 02 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,075 | $70 | Implemented |
UD0671 # 03 Y:2003 | 03 | 2003 | ADD AREA LIGHTING SWITCHES | $12,090 | $15,000 | Not Implemented |
UD0671 # 04 Y:2003 | 04 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,713 | $0 | Not Implemented |
UD0671 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,275 | $0 | Implemented |
UD0671 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,103 | $442 | Not Implemented |
UD0671 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $896 | $270 | Not Implemented |