IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

321

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0238 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,459 $1,660 Implemented
MI0238 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,663 $560 Not Implemented
MI0238 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,216 $2,600 Implemented
MI0238 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,961 $80 Not Implemented
MI0238 # 09 Y:2013 09 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,605 $5,740 Implemented
MI0238 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $224 $430 Not Implemented
MI0219 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,003 $37,014 Implemented
MI0219 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,275 $1,660 Implemented
MI0219 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $5,535 $1,800 Implemented
MI0219 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,117 $4,992 Not Implemented
MI0219 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,739 $6,080 Implemented
MI0219 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,042 $80 Not Implemented
MI0219 # 07 Y:2012 07 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $895 $2,320 Implemented
MI0219 # 08 Y:2012 08 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $734 $120 Implemented
MI0197 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,798 $2,550 Not Implemented
MI0197 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,774 $1,210 Implemented
MI0197 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,594 $40 Not Implemented
MI0197 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,824 $7,562 Not Implemented
MI0197 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,359 $2,850 Not Implemented
MI0197 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,187 $180 Implemented
MI0197 # 07 Y:2010 07 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,983 $2,040 Implemented
UF0421 # 09 Y:2009 09 2009 DEVELOP A REPAIR/REPLACE POLICY $2,717 $0 Not Implemented
UF0421 # 08 Y:2009 08 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,017 $0 Not Implemented
UF0421 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,873 $515 Implemented
UF0421 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,375 $8,700 Not Implemented