IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

247

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0150 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,597 $63 Not Implemented
TT0150 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,475 $3,500 Not Implemented
TT0150 # 06 Y:2015 06 2015 DISCONNECT BALLASTS $1,276 $120 Not Implemented
TT0150 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $891 $275 Not Implemented
TT0151 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,852 $30,000 Not Implemented
TT0151 # 02 Y:2015 02 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,548 $21,700 Not Implemented
TT0151 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $11,094 $20,000 Not Implemented
TT0151 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,096 $600 Not Implemented
TT0151 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,197 $600 Not Implemented
TT0151 # 06 Y:2015 06 2015 DISCONNECT BALLASTS $112 $10 Not Implemented
MZ0154 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $9,053 $1,680 Not Implemented
MZ0154 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,547 $10,920 Not Implemented
MZ0154 # 03 Y:2014 03 2014 USE PHOTOCELL CONTROLS $4,064 $6,700 Not Implemented
MZ0154 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,059 $1,260 Implemented
MZ0154 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,821 $1,740 Not Implemented
MZ0154 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $383 $850 Implemented
TT0116 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $1,609 $5,920 Not Implemented
TT0116 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $837 $763 Not Implemented
TT0116 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,077 $700 Not Implemented
TT0116 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,073 $12,258 Implemented
TT0102 # 01 Y:2013 01 2013 USE OPTIMUM THICKNESS INSULATION $11,651 $2,925 Implemented
TT0102 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $12,842 $21,000 Implemented
TT0102 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,735 $3,000 Implemented
TT0102 # 04 Y:2013 04 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $82 $20 Implemented
TT0102 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $320 $50 Implemented