Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
111
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CM1037 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,469 | $472,800 | n/a |
CM1037 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,212 | $5,526 | n/a |
CM1037 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $223 | $2,035 | n/a |
CM1037 # 05 Y:2024 | 05 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,886 | $3,371 | n/a |
CM1037 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $148 | $250 | n/a |
CM1037 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,561 | $150,694 | n/a |
CO0746 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,082 | $120,593 | n/a |
CO0746 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $415 | $0 | n/a |
CO0746 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $238 | $279 | n/a |
CO0746 # 01 Y:2022 | 01 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $12,559 | $7,100 | n/a |
CO0733 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,360 | $5,950 | n/a |
CO0733 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $750 | n/a |
CO0733 # 04 Y:2016 | 04 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,970 | $34,800 | n/a |
CO0733 # 06 Y:2016 | 06 | 2016 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $2,200 | $9,200 | n/a |
CO0733 # 01 Y:2016 | 01 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,020 | $1,730 | n/a |
CO0733 # 05 Y:2016 | 05 | 2016 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,200 | $500 | n/a |
CO0722 # 08 Y:2016 | 08 | 2016 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,900 | $500 | n/a |
CO0722 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $920 | $5,520 | n/a |
CO0722 # 04 Y:2016 | 04 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,910 | $560 | n/a |
CO0722 # 01 Y:2016 | 01 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,390 | $0 | n/a |
CO0722 # 06 Y:2016 | 06 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,180 | $0 | n/a |
CO0722 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,500 | $21,280 | n/a |
CO0722 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $880 | $110 | n/a |
CO0722 # 05 Y:2016 | 05 | 2016 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,830 | $6,980 | n/a |
CO0721 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,680 | $57,330 | Not Implemented |