Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
155
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2401 # 03 Y:2024 | 03 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $8,586 | $48,007 | n/a |
UC2401 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $719 | $1,986 | n/a |
UC2401 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $614 | $2,242 | n/a |
UC2401 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $612 | $1,300 | n/a |
UC2401 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $935 | $150 | n/a |
UC2401 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,715 | $0 | n/a |
UC2401 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,271 | $653 | n/a |
UC2401 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,744 | $134,289 | n/a |
UC2401 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,791 | $0 | n/a |
UC2312 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,573 | $75 | n/a |
UC2312 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,426 | $1,300 | n/a |
UC2312 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,502 | $150 | n/a |
UC2312 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,161 | $428 | n/a |
UC2312 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,710 | $1,062 | n/a |
UC2312 # 08 Y:2023 | 08 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,522 | $500 | n/a |
UC2312 # 11 Y:2023 | 11 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $892 | $2,151 | n/a |
UC2312 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,947 | $9,514 | n/a |
UC2312 # 07 Y:2023 | 07 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,620 | $19,500 | n/a |
UC2312 # 10 Y:2023 | 10 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $54,436 | $125,322 | n/a |
UC2312 # 12 Y:2023 | 12 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,895 | $34,958 | n/a |
UC2312 # 13 Y:2023 | 13 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,197 | $515,729 | n/a |
UC2312 # 09 Y:2023 | 09 | 2023 | INSULATE BARE EQUIPMENT | $445 | $390 | n/a |
UC2310 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $39,506 | $192,621 | n/a |
UC2310 # 03 Y:2023 | 03 | 2023 | PAY UTILITY BILLS ON TIME | $146 | $0 | n/a |
UC2310 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,045 | $40,103 | n/a |