Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
171
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2403 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,576 | $50 | Implemented |
UC2403 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $64 | $0 | Implemented |
UC2403 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,885 | $0 | Implemented |
UC2403 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,103 | $428 | Not Implemented |
UC2403 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,517 | $311,208 | Not Implemented |
UC2403 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,934 | $0 | Implemented |
UC2403 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,880 | $1,300 | Implemented |
UC2403 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,116 | $333 | Implemented |
UC2403 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $753 | $2,612 | Not Implemented |
MA0808 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT FOR HEAT | $97,263 | $474,397 | Not Implemented |
MA0808 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,081 | $39,024 | Not Implemented |
MA0808 # 05 Y:2019 | 05 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,848 | $500 | Not Implemented |
MA0808 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,080 | $2,000 | Implemented |
MA0808 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,454 | $12,318 | Implemented |
MA0797 # 01 Y:2019 | 01 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $12,419 | $18,225 | Not Implemented |
MA0797 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $845 | $500 | Not Implemented |
MA0797 # 02 Y:2019 | 02 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,247 | $16,050 | Not Implemented |
MA0797 # 04 Y:2019 | 04 | 2019 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,739 | $3,000 | Implemented |
MA0797 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,353 | $500 | Not Implemented |
MA0794 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $1,216 | $852 | Implemented |
MA0794 # 02 Y:2018 | 02 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,204 | $51,700 | Not Implemented |
MA0794 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $710 | $2,583 | Not Implemented |
MA0794 # 01 Y:2018 | 01 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $84,640 | $121,500 | Implemented |
MA0794 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $2,123 | $4,092 | Not Implemented |
MA0780 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $583 | $100 | Not Implemented |