Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
436
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0076 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,880 | $12,650 | Not Implemented |
NL0076 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,194 | $140 | Implemented |
NL0076 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,481 | $25,000 | Not Implemented |
NL0076 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $42,345 | $20,000 | Not Implemented |
NL0076 # 07 Y:2022 | 07 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,084 | $35 | Not Implemented |
NL0076 # 06 Y:2022 | 06 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,338 | $7,210 | Implemented |
NL0076 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,256 | $4,500 | Implemented |
CI0006 # 05 Y:2022 | 05 | 2022 | REPLACE BOILER | $13,563 | $27,000 | n/a |
CI0006 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,588 | $1,342 | n/a |
CI0006 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,279 | $500 | n/a |
CI0006 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,728 | $6,000 | n/a |
CI0006 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,859 | $82,655 | n/a |
CI0006 # 02 Y:2022 | 02 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $26,391 | $90,000 | n/a |
CI0006 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $28,328 | $32,800 | n/a |
CI0005 # 10 Y:2022 | 10 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $323 | $0 | n/a |
CI0005 # 02 Y:2022 | 02 | 2022 | REPLACE BOILER | $15,803 | $9,000 | n/a |
CI0005 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,483 | $99 | n/a |
CI0005 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,446 | $0 | n/a |
CI0005 # 09 Y:2022 | 09 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $563 | $500 | n/a |
CI0005 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,625 | $13,372 | n/a |
CI0005 # 03 Y:2022 | 03 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $9,639 | $30,000 | n/a |
CI0005 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,840 | $300 | n/a |
CI0005 # 06 Y:2022 | 06 | 2022 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $2,348 | $8,100 | n/a |
CI0005 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,200 | $16,400 | n/a |
CO0746 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,082 | $120,593 | n/a |