Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
246
matching recommendationsNAICS | 33211 | Forging and Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0169 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,007 | $0 | Implemented |
IP0169 # 15 Y:2023 | 15 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $10,836 | $47,613 | Not Implemented |
IP0169 # 14 Y:2023 | 14 | 2023 | DISCONNECT BALLASTS | $7 | $20 | Implemented |
IP0169 # 13 Y:2023 | 13 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,020 | $7,379 | Implemented |
IP0169 # 12 Y:2023 | 12 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,942 | $9,196 | Not Implemented |
IP0169 # 11 Y:2023 | 11 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,267 | $5,079 | Implemented |
IP0169 # 10 Y:2023 | 10 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,071 | $15,432 | Implemented |
IP0169 # 09 Y:2023 | 09 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $786 | $679 | Implemented |
IP0169 # 07 Y:2023 | 07 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $1,642 | $661 | Implemented |
IP0169 # 06 Y:2023 | 06 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,069 | $1,503 | Implemented |
IP0169 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,451 | $478 | Implemented |
IP0169 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,581 | $1,991 | Implemented |
IP0169 # 03 Y:2023 | 03 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $141 | $0 | Implemented |
IP0169 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,807 | $69 | Implemented |
IP0169 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,155 | $837 | Implemented |
UD1028 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,469 | $4,200 | Not Implemented |
UD1028 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $3,730 | $5,760 | Not Implemented |
UD1028 # 08 Y:2021 | 08 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $210 | $600 | Not Implemented |
UD1028 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $782 | $0 | Implemented |
UD1028 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,034 | $0 | Not Implemented |
UD1028 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $0 | Not Implemented |
UD1028 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $196 | $0 | Not Implemented |
UD1028 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,623 | $5,000 | Not Implemented |
UD1028 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,408 | $2,814 | Implemented |
WV0556 # 01 Y:2018 | 01 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $51,079 | $225,000 | Not Implemented |