Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
300
matching recommendationsNAICS | 33211 | Forging and Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0333 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,400 | $21,000 | n/a |
TT0333 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,569 | $3,000 | n/a |
TT0333 # 06 Y:2025 | 06 | 2025 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $3,915 | $1,640 | n/a |
TT0333 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,979 | $900 | n/a |
TT0333 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $596 | $1,186 | n/a |
TT0333 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $88,627 | $794,938 | n/a |
TT0333 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,881 | $94 | n/a |
TT0333 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $39,658 | $1,500 | n/a |
CI0041 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,870 | $5,200 | n/a |
CI0041 # 01 Y:2024 | 01 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $349,950 | $1,386,072 | n/a |
CI0041 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $1,157 | $2,000 | n/a |
CI0041 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,103 | $2,000 | n/a |
CI0041 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,096 | $20,568 | n/a |
CI0041 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,660 | $280,607 | n/a |
CI0041 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,571 | $40 | n/a |
CI0041 # 06 Y:2024 | 06 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $16,338 | $9,000 | n/a |
CI0041 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $17,211 | $5,150 | n/a |
TR0061 # 05 Y:2024 | 05 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,297 | $728 | n/a |
TR0061 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,588 | $55,200 | n/a |
TR0061 # 03 Y:2024 | 03 | 2024 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,219 | $4,350 | n/a |
TR0061 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,083 | $551,388 | n/a |
TR0061 # 02 Y:2024 | 02 | 2024 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $9,288 | $17,929 | n/a |
LE0586 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $1,582 | $70 | n/a |
LE0586 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,379 | $2,500 | n/a |
LE0586 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $17,326 | $1,600 | n/a |