IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
NAICS 332119 Metal Crown, Closure, and Other Metal Stamping (except Automotive)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0689 # 06 Y:2004 06 2004 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,597 $0 Not Implemented
UD0689 # 07 Y:2004 07 2004 COMBINE UTILITY METERS $3,895 $10,200 Not Implemented
UD0689 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,140 $0 Not Implemented
UD0689 # 09 Y:2004 09 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,082 $2,000 Not Implemented
UD0689 # 10 Y:2004 10 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,425 $2,540 Not Implemented
UD0689 # 11 Y:2004 11 2004 UPGRADE CONTROLS ON COMPRESSORS $2,285 $0 Implemented
UD0689 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,715 $640 Implemented
UD0689 # 13 Y:2004 13 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,680 $0 Implemented
UD0689 # 14 Y:2004 14 2004 USE PHOTOCELL CONTROLS $1,210 $2,040 Not Implemented
UD0689 # 15 Y:2004 15 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,012 $1,566 Not Implemented
UD0689 # 16 Y:2004 16 2004 USE RADIANT HEATER FOR SPOT HEATING $911 $1,436 Not Implemented
UD0689 # 17 Y:2004 17 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $58 Implemented
UD0689 # 18 Y:2004 18 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $155 $0 Implemented
UD0660 # 01 Y:2003 01 2003 DEVELOP STANDARD OPERATING PROCEDURES $280,000 $58,320 n/a
UD0660 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,779 $0 Implemented
UD0660 # 03 Y:2003 03 2003 FILTER AND REUSE HYDRAULIC OIL $19,375 $4,323 Not Implemented
UD0660 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $15,291 $7,000 Not Implemented
UD0660 # 05 Y:2003 05 2003 REDUCE VENTILATION AIR $8,388 $15,000 Implemented
UD0660 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,666 $1,124 Not Implemented
UD0660 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,568 $6,545 Not Implemented
UD0660 # 08 Y:2003 08 2003 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,026 $8,400 Implemented
UD0660 # 09 Y:2003 09 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,983 $14,150 Not Implemented
UD0660 # 10 Y:2003 10 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,648 $0 Not Implemented
UD0660 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,905 $7,338 Not Implemented
UD0660 # 12 Y:2003 12 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,763 $3,318 Implemented