IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 332119 Metal Crown, Closure, and Other Metal Stamping (except Automotive)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0306 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $494 $1,400 n/a
TT0306 # 09 Y:2024 09 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $650 $100 n/a
TT0306 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $819 $785 n/a
TT0306 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $828 $840 n/a
TT0306 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $917 $113 n/a
TT0306 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,321 $1,560 n/a
TT0306 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,347 $2,600 n/a
TT0306 # 03 Y:2024 03 2024 TREAT AND REUSE RINSE WATERS $3,460 $1,590 n/a
TT0306 # 02 Y:2024 02 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,348 $0 n/a
TT0306 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,784 $3,840 n/a
TT0202 # 05 Y:2017 05 2017 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $3,800 $1,200 Not Implemented
TT0202 # 07 Y:2017 07 2017 INSTALL TIMERS AND/OR THERMOSTATS $197 $100 Implemented
TT0202 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $403 $678 Implemented
TT0202 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $11,774 $40,000 Not Implemented
TT0202 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $16,093 $1,430 Implemented
TT0202 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,949 $3,000 Not Implemented
TT0202 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,716 $83,867 Implemented
TT0064 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $2,500 Implemented
TT0064 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,800 $5,000 Implemented
TT0064 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $37,600 $5,500 Implemented
TT0064 # 06 Y:2011 06 2011 OPTIMIZE PLANT POWER FACTOR $7,300 $8,500 Implemented
TT0064 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,844 $29,100 Implemented
TT0064 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $414 $3,200 Implemented
TT0064 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $957 $4,000 Implemented
TT0064 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,400 $26,700 Implemented