Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
115
matching recommendationsNAICS | 332119 | Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0586 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,427 | $35,960 | n/a |
LE0586 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,340 | $49,500 | n/a |
LE0586 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $17,326 | $1,600 | n/a |
LE0586 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $1,582 | $70 | n/a |
LE0586 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,379 | $2,500 | n/a |
TT0306 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,321 | $1,560 | n/a |
TT0306 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,347 | $2,600 | n/a |
TT0306 # 10 Y:2024 | 10 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $494 | $1,400 | n/a |
TT0306 # 09 Y:2024 | 09 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $650 | $100 | n/a |
TT0306 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $917 | $113 | n/a |
TT0306 # 02 Y:2024 | 02 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,348 | $0 | n/a |
TT0306 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $828 | $840 | n/a |
TT0306 # 03 Y:2024 | 03 | 2024 | TREAT AND REUSE RINSE WATERS | $3,460 | $1,590 | n/a |
TT0306 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,784 | $3,840 | n/a |
TT0306 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $819 | $785 | n/a |
IP0169 # 14 Y:2023 | 14 | 2023 | DISCONNECT BALLASTS | $7 | $20 | Implemented |
IP0169 # 13 Y:2023 | 13 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,020 | $7,379 | Implemented |
IP0169 # 12 Y:2023 | 12 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,942 | $9,196 | Not Implemented |
IP0169 # 11 Y:2023 | 11 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,267 | $5,079 | Implemented |
IP0169 # 09 Y:2023 | 09 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $786 | $679 | Implemented |
IP0169 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,155 | $837 | Implemented |
IP0169 # 06 Y:2023 | 06 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,069 | $1,503 | Implemented |
IP0169 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,451 | $478 | Implemented |
IP0169 # 03 Y:2023 | 03 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $141 | $0 | Implemented |
IP0169 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,007 | $0 | Implemented |