IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

359

matching recommendations
Reset
NAICS 3322 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0264 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $1,650 $6,000 Implemented
IC0264 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,377 Implemented
IC0264 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $2,600 $15,017 Not Implemented
IC0264 # 01 Y:2022 01 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,084 $2,113 Not Implemented
IC0264 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $3,552 $15,893 Not Implemented
IC0264 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $4,150 Implemented
WV0616 # 10 Y:2021 10 2021 DEVELOP A REPAIR/REPLACE POLICY $173 $594 Implemented
WV0616 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,963 $542 Implemented
WV0616 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $412 $25 Implemented
WV0616 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,047 $4,500 Not Implemented
WV0616 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $3,615 $9,369 Not Implemented
WV0616 # 01 Y:2021 01 2021 ADJUST BURNERS FOR EFFICIENT OPERATION $3,763 $7,400 Not Implemented
WV0616 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,079 $2,877 Implemented
WV0616 # 08 Y:2021 08 2021 CONVERT TO OXYFUEL BURNERS $980 $4,400 Not Implemented
WV0616 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,796 $399 Implemented
WV0616 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $2,901 $1,650 Implemented
NC0656 # 04 Y:2021 04 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $13,212 $111,000 n/a
NC0656 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,304 $2,048 n/a
NC0656 # 01 Y:2021 01 2021 RECOVER WASTE HEAT FROM EQUIPMENT $21,457 $44,289 n/a
NC0656 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $39,666 $500 n/a
TT0234 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,041 $3,675 Not Implemented
TT0234 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,742 $3,800 Not Implemented
TT0234 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,207 $3,000 Not Implemented
TT0234 # 02 Y:2020 02 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,187 $15,000 Not Implemented
TT0234 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $18,933 $450 Not Implemented