IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 3322 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0199 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,483 $9,013 Implemented
UA0199 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $3,453 $1,385 Not Implemented
UA0199 # 04 Y:2018 04 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,814 $5,948 Not Implemented
UA0199 # 05 Y:2018 05 2018 OPTIMIZE PLANT POWER FACTOR $1,129 $2,568 Not Implemented
UA0199 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $182 $698 Implemented
UA0199 # 07 Y:2018 07 2018 USE OPTIMUM THICKNESS INSULATION $1,396 $453 Not Implemented
UA0199 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $919 Implemented
UA0199 # 09 Y:2018 09 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $253 $200 Not Implemented
UA0199 # 01 Y:2018 01 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,877 $13,552 Implemented
UA0161 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $140 $34 Implemented
UA0161 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $328 $719 Implemented
UA0161 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $632 $100 Implemented
UA0161 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,411 $8,838 Implemented
TT0163 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,611 $3,000 Implemented
TT0163 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,532 $3,013 Implemented
TT0163 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $423 $1,500 Implemented
TT0163 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,251 $75 Implemented
TT0163 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,380 $1,075 Implemented
TT0163 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $4,100 $4,110 Implemented
TT0163 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,742 $5,000 Not Implemented