IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3322 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0441 # 02 Y:2012 02 2012 USE RADIANT HEATER FOR SPOT HEATING $78,225 $74,340 Not Implemented
WV0441 # 15 Y:2012 15 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,137 $1,063 Implemented
WV0441 # 14 Y:2012 14 2012 IMPROVE LUBRICATION PRACTICES $2,709 $3,400 Not Implemented
WV0441 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,782 $0 Implemented
WV0441 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,825 $12,850 Not Implemented
WV0441 # 11 Y:2012 11 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,115 $3,000 Not Implemented
WV0441 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,022 $9,275 Implemented
WV0441 # 09 Y:2012 09 2012 OPTIMIZE PLANT POWER FACTOR $10,618 $46,340 Not Implemented
WV0441 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,024 $37,887 Implemented
WV0441 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $20,023 $6,777 Not Implemented
WV0441 # 06 Y:2012 06 2012 DEVELOP A REPAIR/REPLACE POLICY $38,793 $10,750 Implemented
WV0441 # 05 Y:2012 05 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $49,557 $11,000 Implemented
WV0441 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,675 $91,200 Implemented
WV0441 # 03 Y:2012 03 2012 UPGRADE CONTROLS ON COMPRESSORS $73,647 $33,378 Implemented
WV0441 # 01 Y:2012 01 2012 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $200,857 $610,000 Not Implemented
LE0225 # 01 Y:2005 01 2005 $28,200 $2,000 Not Implemented
LE0225 # 02 Y:2005 02 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $17,500 $50,000 Implemented
LE0225 # 03 Y:2005 03 2005 INSTALL TIMERS AND/OR THERMOSTATS $11,161 $2,800 Not Implemented
LE0225 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,707 $200 Implemented
LE0225 # 05 Y:2005 05 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,158 $800 Not Implemented
LE0225 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $100 Implemented
LE0225 # 07 Y:2005 07 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,914 $2,500 Implemented
LE0225 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,118 $350 Not Implemented
LE0225 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,090 $35,595 Implemented