IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 33221 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0374 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,831 $2,213 Implemented
WV0374 # 12 Y:2008 12 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $389 $690 Not Implemented
WV0374 # 11 Y:2008 11 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,750 $1,884 Not Implemented
WV0374 # 10 Y:2008 10 2008 RECOVER WASTE HEAT FROM EQUIPMENT $2,784 $440 Not Implemented
WV0374 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,039 $9,054 Not Implemented
WV0374 # 08 Y:2008 08 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,513 $315 Implemented
WV0374 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $4,440 $612 Not Implemented
WV0374 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,079 $6,378 Implemented
WV0374 # 05 Y:2008 05 2008 OPTIMIZE PLANT POWER FACTOR $5,562 $11,346 Not Implemented
WV0374 # 04 Y:2008 04 2008 DEVELOP A REPAIR/REPLACE POLICY $7,339 $1,076 Implemented
WV0374 # 03 Y:2008 03 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,994 $4,500 Implemented
WV0374 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,144 $12,730 Implemented
WV0373 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,505 $23,741 Not Implemented
WV0373 # 10 Y:2008 10 2008 USE SYNTHETIC LUBRICANT $75 $21 Not Implemented
WV0373 # 09 Y:2008 09 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $384 $762 Not Implemented
WV0373 # 08 Y:2008 08 2008 DEVELOP A REPAIR/REPLACE POLICY $581 $336 Implemented
WV0373 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $647 $106 Not Implemented
WV0373 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,088 $21 Not Implemented
WV0373 # 05 Y:2008 05 2008 INSTALL SET-BACK TIMERS $3,832 $1,105 Not Implemented
WV0373 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $5,558 $1,485 Not Implemented
WV0373 # 03 Y:2008 03 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,596 $273 Not Implemented
WV0373 # 02 Y:2008 02 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,342 $29,120 Not Implemented