Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0646 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $276 | $932 | Implemented |
SD0646 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,254 | $250 | Implemented |
SD0646 # 11 Y:2024 | 11 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $516 | $250 | Implemented |
SD0646 # 10 Y:2024 | 10 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,515 | $6,200 | Implemented |
SD0646 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,221 | $10,759 | Implemented |
SD0646 # 05 Y:2024 | 05 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $8,600 | $0 | Implemented |
SD0646 # 06 Y:2024 | 06 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $32,881 | $97,356 | Implemented |
SD0646 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $678 | $180 | Implemented |
SD0646 # 02 Y:2024 | 02 | 2024 | ADJUST BURNERS FOR EFFICIENT OPERATION | $16,626 | $6,076 | Implemented |
SD0646 # 03 Y:2024 | 03 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $503 | $614 | Implemented |
SD0646 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $81,600 | $250,043 | Implemented |
SF0592 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,009 | $0 | Implemented |
SF0592 # 06 Y:2023 | 06 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $8,739 | $30,000 | Implemented |
SF0592 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $13,506 | $24,333 | Implemented |
SF0592 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,309 | $1,263 | Implemented |
SF0592 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,682 | $0 | Implemented |
SF0592 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,569 | $0 | Implemented |
SD0622 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,925 | $6,341 | Implemented |
SD0622 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,131 | $800 | Implemented |
SD0616 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,168 | $7,800 | Implemented |
SD0616 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,932 | $1,479 | Implemented |
SD0610 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,043 | $3,772 | Implemented |
SD0610 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,425 | $14,300 | Implemented |
SF0571 # 05 Y:2021 | 05 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,182 | $2,146 | Implemented |
SF0571 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,241 | $10,932 | Implemented |