Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,171
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0607 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,155 | $2,492 | Not Implemented |
WV0607 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,519 | $50 | Implemented |
WV0607 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $635 | $1,054 | Implemented |
WV0607 # 06 Y:2021 | 06 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $326 | $358 | Implemented |
WV0607 # 07 Y:2021 | 07 | 2021 | OPTIMIZE PLANT POWER FACTOR | $321 | $1,410 | Not Implemented |
UF0561 # 01 Y:2020 | 01 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $136,163 | $259,600 | Implemented |
UF0561 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,219 | $20,000 | Implemented |
UF0561 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,460 | $31,240 | Implemented |
UF0561 # 04 Y:2020 | 04 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,358 | $2,343 | Implemented |
UF0561 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,808 | $1,360 | Implemented |
UF0561 # 06 Y:2020 | 06 | 2020 | USE PHOTOCELL CONTROLS | $7,062 | $4,098 | Implemented |
UF0561 # 07 Y:2020 | 07 | 2020 | USE COMPRESSOR AIR FILTERS | $2,064 | $5,898 | Implemented |
UF0561 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,057 | $930 | Implemented |
UF0561 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,043 | $0 | Implemented |
UF0561 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,816 | $421 | Implemented |
UF0561 # 11 Y:2020 | 11 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,418 | $5,192 | Implemented |
UF0561 # 12 Y:2020 | 12 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $854 | $800 | Implemented |
UF0561 # 13 Y:2020 | 13 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $624 | $0 | Implemented |
OR0738 # 01 Y:2021 | 01 | 2021 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $242,489 | $81,465 | Not Implemented |
OR0738 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $13,131 | $8,725 | Not Implemented |
OR0738 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,831 | $1,000 | Not Implemented |
OK1040 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $83,427 | $407,400 | Not Implemented |
OK1040 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,167 | $70,338 | Not Implemented |
OK1040 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,923 | $2,911 | Implemented |
OK1040 # 04 Y:2021 | 04 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,152 | $4,457 | Implemented |