Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
155
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0561 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,219 | $20,000 | Implemented |
UF0561 # 01 Y:2020 | 01 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $136,163 | $259,600 | Implemented |
UF0561 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,816 | $421 | Implemented |
UF0561 # 12 Y:2020 | 12 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $854 | $800 | Implemented |
UF0561 # 11 Y:2020 | 11 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,418 | $5,192 | Implemented |
UF0561 # 04 Y:2020 | 04 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,358 | $2,343 | Implemented |
UF0561 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,460 | $31,240 | Implemented |
UF0561 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,043 | $0 | Implemented |
UF0561 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,057 | $930 | Implemented |
UF0561 # 06 Y:2020 | 06 | 2020 | USE PHOTOCELL CONTROLS | $7,062 | $4,098 | Implemented |
MI0378 # 07 Y:2020 | 07 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,694 | $1,195 | Implemented |
MI0378 # 10 Y:2020 | 10 | 2020 | ISOLATE HOT OR COLD EQUIPMENT | $671 | $560 | Not Implemented |
MI0378 # 09 Y:2020 | 09 | 2020 | USE PHOTOCELL CONTROLS | $981 | $1,141 | Not Implemented |
MI0378 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $1,344 | $1,042 | Not Implemented |
MI0378 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,909 | $1,980 | Implemented |
MI0378 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,502 | $2,100 | Implemented |
MI0378 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,737 | $11,160 | Implemented |
MI0378 # 03 Y:2020 | 03 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $7,580 | $6,182 | Not Implemented |
MI0378 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,840 | $2,673 | Not Implemented |
MI0378 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,828 | $480 | Implemented |
MI0335 # 08 Y:2018 | 08 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,157 | $5,370 | Implemented |
MI0335 # 04 Y:2018 | 04 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,798 | $7,385 | Implemented |
MI0335 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,894 | $2,030 | Implemented |
MI0335 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,167 | $8,063 | Implemented |
MI0335 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,545 | $3,280 | Implemented |