IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,176

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0558 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,337 $441 Not Implemented
IA0558 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $981 $2,040 Not Implemented
IA0558 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $589 $1,290 Not Implemented
IA0558 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $374 $60 Not Implemented
IA0558 # 06 Y:2016 06 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $352 $60 Not Implemented
IA0558 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $281 $337 Not Implemented
IA0558 # 08 Y:2016 08 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $242 $200 Not Implemented
IA0556 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,574 $23,858 Implemented
IA0556 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,085 $9,800 Not Implemented
IA0556 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,881 $4,905 Implemented
IA0556 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $1,796 $3,898 Implemented
IA0556 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,632 $513 Implemented
IA0556 # 06 Y:2016 06 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,391 $462 Not Implemented
IA0556 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,271 $90 Implemented
IA0556 # 08 Y:2016 08 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $880 $120 Implemented
CO0721 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $1,500 Implemented
CO0721 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,680 $57,330 Not Implemented
CO0721 # 03 Y:2016 03 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,080 $13,230 Not Implemented
UD0945 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,063 $8,000 Implemented
UD0945 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $527 $0 Implemented
UD0945 # 03 Y:2016 03 2016 REDUCE FLUID FLOW RATES $7,163 $0 Implemented
UD0945 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $623 $30 Implemented
UD0945 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $77,225 $18,850 Not Implemented
UD0945 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,486 $8,972 Not Implemented
UD0945 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,610 $0 Not Implemented