Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,176
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0679 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,100 | $2,160 | Not Implemented |
AM0679 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $120 | $290 | Not Implemented |
AM0679 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $340 | $0 | Not Implemented |
AM0679 # 09 Y:2015 | 09 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $100 | $390 | Not Implemented |
LE0393 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,445 | $25 | Not Implemented |
LE0393 # 02 Y:2015 | 02 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $4,240 | $1,125 | Not Implemented |
LE0393 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,825 | $1,000 | Not Implemented |
LE0393 # 04 Y:2015 | 04 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $130 | $75 | Not Implemented |
LE0393 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $181 | $365 | Not Implemented |
LE0393 # 06 Y:2015 | 06 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,198 | $3,052 | Not Implemented |
LE0393 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $15,747 | $40,880 | Not Implemented |
LE0393 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,275 | $4,018 | Not Implemented |
LE0393 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,261 | $11,400 | Not Implemented |
LE0393 # 10 Y:2015 | 10 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $311 | $1,313 | Not Implemented |
LE0393 # 11 Y:2015 | 11 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $66 | $289 | Not Implemented |
TT0150 # 01 Y:2015 | 01 | 2015 | OPTIMIZE PLANT POWER FACTOR | $19,615 | $36,000 | Not Implemented |
TT0150 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,344 | $10,000 | Not Implemented |
TT0150 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,515 | $3,000 | Not Implemented |
TT0150 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,597 | $63 | Not Implemented |
TT0150 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,475 | $3,500 | Not Implemented |
TT0150 # 06 Y:2015 | 06 | 2015 | DISCONNECT BALLASTS | $1,276 | $120 | Not Implemented |
TT0150 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $891 | $275 | Not Implemented |
UM0452 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,871 | $1,000 | Not Implemented |
UM0452 # 02 Y:2015 | 02 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,393 | $2,500 | Implemented |
UM0452 # 03 Y:2015 | 03 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $28,779 | $28,000 | Implemented |