IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0421 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $61,784 $549,237 n/a
MS0421 # 01 Y:2023 01 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,588 $25,000 n/a
MS0421 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $132 $120 n/a
MS0396 # 04 Y:2022 04 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $707 $0 Not Implemented
MS0396 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $295 $0 Implemented
MS0396 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $9,487 $17,752 Not Implemented
MS0396 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,455 $0 Implemented
UA0093 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,514 $1,600 Not Implemented
UA0093 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,728 $0 Implemented
UA0093 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,498 $2,500 Implemented
UA0093 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $8,477 $15,565 Not Implemented
UA0093 # 05 Y:2013 05 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $30,129 $6,665 Not Implemented
MS0331 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $81,985 $18,000 Not Implemented
MS0331 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,633 $1,260 Not Implemented
MS0331 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,140 $9,209 Not Implemented
MS0331 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,285 $401 Not Implemented
MS0331 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,715 $2,550 Not Implemented
MS0331 # 03 Y:2008 03 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,107 $0 Not Implemented
MS0331 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91,249 $79,567 Not Implemented
MS0316 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,634 $27,365 Not Implemented
MS0316 # 02 Y:2007 02 2007 COMBINE UTILITY METERS $15,244 $0 Implemented
MS0316 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,294 $247 Implemented
MS0316 # 04 Y:2007 04 2007 $1,523 $1,575 Implemented
MS0316 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $545 $5,264 Not Implemented
MS0313 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,195 $231 Not Implemented