IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1068 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,431 $994 n/a
UD1068 # 01 Y:2023 01 2023 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $529 $0 n/a
UD1068 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,164 $0 n/a
UD1068 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,629 $952 n/a
UD1068 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $425 $0 n/a
UD1068 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $7,530 $4,236 n/a
UD1048 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,915 $625 Not Implemented
UD1048 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,039 $0 Not Implemented
UD1048 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $952 Not Implemented
UD1048 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,115 $1,409 Not Implemented
UD1048 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,481 $35 Not Implemented
UD1048 # 03 Y:2022 03 2022 DISCONNECT BALLASTS $1,787 $0 Implemented
UD1048 # 08 Y:2022 08 2022 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $573 $1,065 Not Implemented
UD1048 # 01 Y:2022 01 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,150 $1,500 Not Implemented
UD0945 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,610 $0 Not Implemented
UD0945 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,063 $8,000 Implemented
UD0945 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $623 $30 Implemented
UD0945 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $77,225 $18,850 Not Implemented
UD0945 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,486 $8,972 Not Implemented
UD0945 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $527 $0 Implemented
UD0945 # 03 Y:2016 03 2016 REDUCE FLUID FLOW RATES $7,163 $0 Implemented
UD0945 # 14 Y:2016 14 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $756 $300 Not Implemented
UD0945 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,976 $0 Implemented
UD0945 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,501 $0 Not Implemented
UD0945 # 10 Y:2016 10 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,904 $23,828 Not Implemented