Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,116
matching recommendationsNAICS | 33231 | Plate Work and Fabricated Structural Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1116 # 05 Y:2025 | 05 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $251 | $0 | n/a |
UD1116 # 07 Y:2025 | 07 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $712 | $1,015 | n/a |
UD1116 # 02 Y:2025 | 02 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,462 | $15,035 | n/a |
UD1116 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,166 | $5,318 | n/a |
UD1116 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,126 | $5,813 | n/a |
UD1116 # 04 Y:2025 | 04 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,842 | $908 | n/a |
UD1116 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,791 | $0 | n/a |
UD1116 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,999 | $5,700 | n/a |
WV0685 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,411 | $9,050 | n/a |
WV0685 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $240 | $210 | n/a |
WV0685 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $7,381 | $3,621 | n/a |
WV0685 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,445 | $16,580 | n/a |
WV0685 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,123 | $513 | n/a |
WV0685 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $366 | $435 | n/a |
WV0685 # 05 Y:2025 | 05 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,728 | $8,100 | n/a |
MZ0375 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,435 | $12,750 | n/a |
MZ0375 # 03 Y:2025 | 03 | 2025 | USE PHOTOCELL CONTROLS | $1,090 | $1,405 | n/a |
MZ0375 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,865 | $0 | n/a |
MZ0375 # 01 Y:2025 | 01 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,447 | $22,100 | n/a |
MZ0375 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,746 | $214,502 | n/a |
MZ0375 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $295 | $2,100 | n/a |
MZ0375 # 09 Y:2025 | 09 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $394,334 | $2,410,000 | n/a |
MZ0375 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,208 | $400 | n/a |
MZ0375 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,542 | $13,100 | n/a |
UW2504 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,995 | $262,084 | n/a |