IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 33231 Plate Work and Fabricated Structural Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0428 # 15 Y:2011 15 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,154 $25 Implemented
WV0428 # 14 Y:2011 14 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,082 $600 Implemented
WV0428 # 13 Y:2011 13 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,404 $0 Not Implemented
WV0428 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,254 $3,010 Not Implemented
WV0428 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $5,623 $1,890 Not Implemented
WV0428 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,120 $700 Implemented
WV0428 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,061 $8,550 Not Implemented
WV0428 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,107 $9,060 Not Implemented
WV0428 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,763 $1,000 Implemented
WV0428 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $11,317 $815 Implemented
WV0428 # 04 Y:2011 04 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,157 $24,000 Not Implemented
WV0428 # 09 Y:2011 09 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,253 $2,000 Implemented
WV0428 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,746 $80,800 Not Implemented
WV0428 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $74,991 $209,000 Not Implemented
UD0812 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,893 $6,240 Not Implemented
UD0812 # 03 Y:2010 03 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,148 $0 Not Implemented
UD0812 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,589 $1,000 Not Implemented
UD0812 # 05 Y:2010 05 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,047 $12,500 Not Implemented
UD0812 # 06 Y:2010 06 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,040 $16,000 Not Implemented
UD0812 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,335 $2,310 Not Implemented
UD0812 # 09 Y:2010 09 2010 COVER OPEN TANKS $4,280 $3,600 Not Implemented
UD0812 # 11 Y:2010 11 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $800 $2,500 Not Implemented
UD0812 # 12 Y:2010 12 2010 INSTALL AUTOMATIC STACK DAMPER $20,826 $200 Not Implemented
UD0812 # 13 Y:2010 13 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,114 $70,000 Not Implemented
UD0812 # 14 Y:2010 14 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,930 $10,000 Not Implemented